toreama.blogg.se

Bareme kilometre 2014
Bareme kilometre 2014







bareme kilometre 2014

Due to lack of knowledge and incompetency of USFD operators, these defects were not detected in USFD testing on May 8,” the CRS report said.įollowing the development, the Konkan railway employees Union has demanded that the KR management take the issue of passenger railway safety seriously. Both defects noticed in the rail, which fractured were detectable during USFD testing on May 8. During testing, one defect was found in the rail, which fractured in the October 7 accident. “USFD testing of rail, which fractured was done on May 8, 2014.

#Bareme kilometre 2014 manual#

“As USFD testing has been outsourced, engineering officials and officers are not showing concern about proper USFD testing/test check manual which has resulted in the accident. The CRS noted that KRC officials were simply signing USDF testing report without doing test check and verifying factual position on reports submitted by the agency. The CRS said that the USFD operator of the firm engaged by the KRC was not having knowledge of USFD manual, adding, “it appears that they had not taken formal training in USFD testing of rails and welds as per stipulation of manual.”

bareme kilometre 2014

It would have been a disaster if a passenger train had met with an accident,” the report said.

bareme kilometre 2014

“It was a matter of chance that the train which derailed on rail fracture was a goods train. While calling for safety precautions at tunnels, bridges, tunnels, bridge approaches and high embankments, the SRS has told the KR to set up a high-level Director-level committee to address all issues of safety. The CRS has further recommended introduction of round-the-clock patrolling on the pattern of cold weather patrolling along the entire length of the Konkan railway.









Bareme kilometre 2014